Coldwater Canyon – Beverly Hills

  • Irrigation system and controllers
  • Landscaping and sod installation
  • Placement of boulders
  • Import of soil and amendments
  • Mulch application

Mid City Expo – Los Angeles

  • Irrigation system and controllers
  • Removal and relocation of palms
  • Installation of new palms, trees and plant material
  • Amending of soil
  • Mulch installation
  • Aggregate and DG installation
  • Crossovers

Prado Dam

  • Temporary irrigation system covering 80 plus acres
  • Solar and battery powered controllers
  • Weed abatement including herbicide application
  • Amending of soil
  • Hydroseeding of 80 plus acres
  • Army Corps of Engineers project
  • Stronghold Engineering, Inc.-award winning project

The Pine Tree Wind Farm

The Pine Tree Wind Farm is a 300 plus acre hydroseeding and erosion control project for the LADWP located near Mojave California. Diversified Landscape Co. is the subcontractor for the hydroseeding and erosion control portion of this Kiewit project. DLC designed the stabilization specifications for this project to maximize the erosion control on the disturbed areas and to ensure proper revegetation. The mixture used on this project constituted of wood fiber matrix, plantago tackifier, HydroGel (a polymer that is able to store water and nutrients up to 500% its own size and weight.), FiberPlus (specially coated synthetic fiber to improve the tenacity and bonding), compost and a blend of native seeds to bring the disturbed area back to their original vegetated state.

Lake Elsinore Outlet Improvements

  • Hardscape – Split-face block-wall, sidewalk, pilasters with decorative rock veneer
  • Fencing – wrought iron fencing
  • Electric metered service (SCE approved)
  • Irrigation and landscape

Tahquitz High School

  • Sports Fields
  • Irrigation system and controllers
  • Landscaping of all school facilities
  • Drainage canal improvements
  • Hydroseeding of canal areas

5 Fwy – Buena Park

  • Various locations – Rock Blanket